MENU
Aerial view of parliament hill in ottawa
01
Accueil
02
Services
03
Secteurs
04
Équipe
05
Notre travail
06
Mises à jour
07
Carrières
08
Personne-ressource
Services
01
Relations avec le gouvernement
02
Communications et numérique
03
Services consultatifs
Secteurs
01
Énergie
02
Environnement
03
Soins de santé
Mises à jour
01
Perspectives
02
Nouvelles
EN
FR
ServicesSecteursÉquipeNotre travailPerspectives
EN
FR
aperçus
mises à jour
December 17, 2020

Ontario Proposes Amendments to Emissions Performance Standards (EPS) Regulations

Écrit par
Équipe Énergie
Ontario Proposes Amendments to Emissions Performance Standards (EPS) Regulations

Please be advised that the Ontario Ministry of Environment, Conservation and Park (MECP) posted proposed amendments to regulations related to the Ontario Emissions Performance Standards (EPS) on the Environmental Registry website, here. Comments and feedback will be accepted until January 15, 2021. The ministry also plans to host virtual consultation sessions for stakeholders.

The proposed amendments include changes to the following regulations and incorporated documents:

  • Greenhouse Gas Emissions Performance Standards regulation (O. Reg. 241/19 or the EPS Regulation) and the incorporated GHG Emissions Performance Standards and Methodology for the Determination of the Total Annual Emissions Limit (the Methodology); and
  • Greenhouse Gas Emissions: Quantification, Reporting and Verification regulation (O. Reg. 390/18 or the Reporting Regulation) and the incorporated Guideline for Quantification, Reporting and Verification of Greenhouse Gas Emissions (the Guideline).


By way of background, the Ontario EPS is the federally-approved alternative to the federal output-based pricing system (OBPS). The EPS is intended to regulate greenhouse gas emissions from large industrial facilities in the province, by setting the standards for lowering emissions that facilities are required to meet and considering specific industry and facility conditions while allowing for economic growth.

The MECP is awaiting a decision from the federal government on a start date for compliance obligations under the EPS program; at this time, it is still undecided if this will begin in 2021, or 2022.

In the interim, the MECP is consulting on the proposed amendments now to ensure a smooth transition for industry from the federal OBPS to the Ontario EPS program.
Ontario’s proposed amendments include:

1. Proposed start date of January 1, 2021 for application of all provisions of the EPS program (will be amended if a 2022 start date is chosen)

2. Amending provisions related to the start date of compliance obligations

3. Aligning scope of the EPS to match the federal OBPS by proposing additional sectors that can voluntarily opt-in to the EPS:
‍
NAICS Code Description
‍
31142 Fruit and vegetable canning, pickling and drying
311611 Animal (except poultry) slaughtering
32222 Paper bag and coated and treated paper manufacturing
32614 Polystyrene foam product manufacturing
32621 Tire manufacturing
33211 Forging and stamping
33635 Motor vehicle transmission and power train parts manufacturing

4. Amendments to support the ability for registered facilities to maintain their exemption from the federal fuel charge

5. Other administrative and clarifying amendments

The posting also indicated that MECP intends to propose additional amendments to the EPS Regulation and the Reporting Regulation and related incorporated documents in late winter 2021. These amendments would address any other issues that may arise from ongoing transition discussions with the federal government. At that time, we may also propose amendments to enhance and improve enforcement and administration of the program.

Please let our team know if you have any questions, or if we can provide assistance with your submission.

Aucun objet trouvé.
partager l'article
Lien copié
‍

Messages récents

L'Ontario lance son guide stratégique sur les centres de données
August 13, 2026

L'Ontario lance son guide stratégique sur les centres de données

Un nouveau cadre définit la façon dont l’Ontario évaluera et priorisera les futurs investissements dans les centres de données.‍

L’énergie, l’ambition que le Québec ne peut plus reporter
August 11, 2026

L’énergie, l’ambition que le Québec ne peut plus reporter

Quebec’s next government will not be judged only on its ability to manage public finances, public services or the economy. It will also be judged on a defining question: did it give Quebec the energy needed to support its ambitions?

Protéger votre projet contre les aléas électoraux en 2026
July 14, 2026

Protéger votre projet contre les aléas électoraux en 2026

Les élections municipales de 2026 en Ontario se dérouleront sur un terrain connu, mais plus exigeant : le logement, l’abordabilité et les infrastructures locales qui rendent la croissance viable. Les maires, les conseillers et le personnel municipal subissent une pression accrue pour démontrer des progrès concrets, au-delà des simples débats. Pour les promoteurs, les institutions et les grands acteurs qui font avancer des projets à l’échelle municipale, cela signifie une chose : si votre travail est visible, il sera politique.

voir tout
Je vous remercie ! Votre soumission a bien été reçue !
Oups ! Quelque chose s'est mal passé lors de la soumission du formulaire.
entreprise
AccueilÉquipeCarrièresPersonne-ressourceModalités et politiquesAccessibilité
explorer
ServicesSecteursNotre travailMises à jourS'abonner
suivez-nous
Ce site a été traduit automatiquement à l'aide des outils de localisation de Webflow.
TOUS DROITS RÉSERVÉS © 2020
Reconnaissance des terres